Explain the problem in under 20 seconds (Checkout database at 98% CPU before Black Friday).
“Hi, this is David Chen calling from Seattle. In this part of the interview, I'm looking for specific examples from your past work. Tell me about a time when a critical project or production system was at risk, and you had to make a fast engineering trade-off under pressure. What did you personally do, and what was the measurable outcome?”
“Right before Black Friday, our checkout database hit 98% CPU and put $1.2 million at risk. I found the top three slow N-plus-one queries and shipped a Redis cache in 48 hours. That cut load by 68% with zero downtime.”